Eureka Road
- Project Status: Completed
- Completion Date: August 2024
Works commenced in April 2024 for installation of a new bridge on Eureka Road.
The previous box culvert was damaged during the 2020 natural disaster (AGRN943) and approval was obtained to replace the ineffective structure with a bridge system.
These works involved removing the existing infrastructure and preparing the area for bridge construction. To minimise impact to residents and traffic flow during the construction work a temporary track was established as a side road.