Suffolk Road

Project Timeline

  • Project Status: Construction Underway
  • Completion Date: Anticipated May 2025

Works are commencing on Suffolk Road in February 2025 to remove the temporary piped creek crossing and install a new concrete box culvert impacted by the 2022 natural disaster (AGRN1012) identified on the below map.
2025_Suffolk_Map.png

During the works a temporary alternate vehicle track will be provided for the duration of the works. This is planned to be within the road reserve and sit parallel to the existing road culvert. There will likely be intermittent traffic stops during high-risk construction activities, such as lifting culverts into place. These times will be communicated directly with the residents and/or using site noticeboards.