Wyrallah Road

Project Timeline

  • Project Status: Completed
  • Completion Date: July 2023

Following the 2022 natural disaster (AGRN1012), Wyrallah Road suffered extensive damage. Funding was secured through Transport for NSW to repair damage sustained during the event with works commencing at the end of January 2023 for pavement rehabilitation. The map below provides an overview of the location of the works.

Wyrallah_Map.png

The works involved reconstruction and rehabilitation of approximately 500m of Wyrallah Road. Including removing approximately 400mm of shoulder material and replacing this section with roadbase through the first 100m of the project from Lismore. Next, approximately 100mm of the existing surface was overlaid and stabilised. Throughout the remaining 250m length of the road, crews removed unsuitable material to an approximate depth of 600mm below existing heights and replace it with 500mm of rock, and 350mm of roadbase. This resulted in an increased road height of approximately 250mm from the existing height to the finish surface height. Throughout the construction process, drainage works, kerb installation and subsoil installation was also completed.

Wyrallah_Rd.jpg